(Added). Maloney Elementary, new play structure, equipment installed by Blanchard Construction. Aug. 11, 2011.
Students from Mission San Jose High who attended the RYLA summer camp.
(Added). Maloney Elementary, new play structure, equipment installed by Blanchard Construction. Aug. 11, 2011.
(Added). Maloney Elementary, new play structure, equipment installed by Blanchard Construction. Aug. 11, 2011.
(Added). Maloney Elementary, new play structure, equipment installed by Blanchard Construction. Aug. 11, 2011.
See photo in original gallery.
Business, Sakane Lock & Security